خانه محصولاتقطعات یدکی برای تجهیزات ساخت و ساز

Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction

گواهی
کیفیت خوب بیل هیدرولیک Crawler برای فروش
کیفیت خوب بیل هیدرولیک Crawler برای فروش
Thanks for all your cooperation, the more orders, the better service.....

—— Johnny Benson

Yesterday, we cooperated and trusted each, tomorrow, we share the same breath for win-win. My friend, thank you.

—— Charles Soludo

Since We choose your factory and trucks, we are in good way!

—— HADJADJ EL-HASSEN

Nous sommes une entreprise en Togo, nous avons bien collaboré avec SINOTRUK KOGEL depuis 7 ans. Grace à son support, nous possèdons un très bon marché

—— Dinga

چت IM آنلاین در حال حاضر

Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction

چین Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction تامین کننده
Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction تامین کننده Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction تامین کننده

تصویر بزرگ :  Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction

جزئیات محصول:

Place of Origin: China
نام تجاری: XGMA
گواهی: ISO 9001:2008
Model Number: Earth Pressure Balance(EPB)TBM

پرداخت:

Minimum Order Quantity: 1
قیمت: Negotiable
Packaging Details: Seaworthy packing will comply with international standards, which is suitable for sea transportation and land transportation
Delivery Time: 18 months after receiving advanced payment
مخاطب
توضیحات محصول جزئیات
برجسته:

construction equipment parts

,

heavy equipment parts

Description:

 

Earth Pressure Balance(EPB)TBM

When an EPB TBM bores, its cutter head in front rotates to excavate the soil into the muck chamber. When the chamber is full of mucks, its passive earth pressure is basically the same as the earth and water pressure exerted on the cutting face; resultantly, the balance of the face is realized and maintained (i.e. the faceis dynamically stable).

 

 

Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction

 

Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction

 

 

 

 

 

 

 

 

 

 

 

 

 

اطلاعات تماس
Shandong Sinomtp Construction Equipment Company Limited

تماس با شخص: libaiyan

ارسال درخواست خود را به طور مستقیم به ما (0 / 3000)